Installation Steps

During Construction

  1. Pre-Wiring

    • Pass all your CAT5/CAT6 and other wires required to power all the lights you will be installing.
  2. Enclosures Installation

Post construction / pre-finish

  1. DMX Drivers Installation

  2. DMX Amplifiers Installation

  3. CBNA Processor Installation

  4. Hookups

Post-Finish

  1. DMX Driver addressing

  2. CBNA Processor configuration

  3. 3rd Party Integration

    • Integrate with a 3rd party system for more control in sync with the rest of the building. (See the 3rd Party Integration section for more details)